Case study · Techno-Economic Viability Studies
From TEV to LIE: a slum-rehabilitation redevelopment in Jogeshwari
A public-sector bank appointed us first for the techno-economic viability study of an SRA residential redevelopment in Jogeshwari (East), Mumbai, and then as Lender's Independent Engineer for the same project through to completion.
Client
A Mumbai developer's slum-rehabilitation residential project
Service
Techno-Economic Viability study, then Lender's Independent Engineer
Sector
Real estate — slum rehabilitation (SRA) residential redevelopment
Asset
Proposed residential buildings under a Slum Rehabilitation Scheme
Location
Jogeshwari (East), Mumbai
Appointed by
A public-sector bank — two branches, for appraisal and then monitoring
Period
TEV June 2023 to July 2024; LIE August 2023 to December 2025
Scale
Project cost above Rs 300 crore; term loan appraised above Rs 250 crore
01 · The assignment
What was asked
Slum Rehabilitation Scheme projects in Mumbai are financed against a particular risk profile: the rehabilitation buildings for existing occupants must be built and handed over before the sale component can be fully realised, approvals arrive in stages, and the schedule depends on consents as much as on construction.
The bank appraising the term loan asked us for a techno-economic viability study of the project. Once the loan was sanctioned, a second branch of the same bank appointed us as Lender's Independent Engineer to monitor construction and disbursement through to completion.
02 · What we did
How the work ran
- 01TEV: review of the approvals in hand and pending, the rehabilitation and sale components, the construction cost estimate against the approved plans, the sales assumptions against the locality's evidence, and the project cash flows under the bank's base case and stress cases.
- 02LIE: a baseline review of the sanctioned cost and schedule, then periodic site visits at each disbursement request to verify work done, costs incurred and the use of earlier disbursements, with a report and recommendation to the bank each time.
- 03Completion: a final verification when the monitored works were complete in December 2025, closing a monitoring period of a little over two years.
03 · Technical considerations
What mattered for this asset
In an SRA project, progress on the rehabilitation building is the gating item: delays there hold back the sale building's occupation certificate, so monitoring tracks both components separately.
The TEV's cost estimate becomes the LIE's yardstick. Having prepared the first, we could verify the second against the same bill of quantities rather than reconstructing it.
Fund-utilisation checks on redevelopment projects have to separate construction spend from transit-rent and consent-related payments, which are legitimate project costs but not visible as work on site.
04 · Outcome
What the record shows
The TEV report was delivered in July 2024 and the LIE mandate was completed in December 2025, both recorded in our assignment registers submitted to the bank.
The project is one of about 45 real-estate LIE mandates in our records; this one shows how the viability study and the monitoring role connect.
Client: a Mumbai developer's slum-rehabilitation residential project (not named). Dates and scope are as recorded in our assignment registers; amounts are rounded bands and lender branches are not identified.
Who does the work
Our team for this service
The registered valuers and engineers who work on TEV assignments like this one.

Sharadkumar B. Chalikwar
Chairman & Managing Director
IBBI — Land & BuildingIncome Tax — Land & Building, Plant & MachineryIOV — Land & BuildingIIV — Plant & MachineryPVAI — Land & BuildingChartered Engineer (India) — The Institution of Engineers (India)Fellow — The Institution of Engineers (India)

Manoj B. Chalikwar
Joint Managing Director
IBBI — Land & Building, Plant & MachineryIncome Tax — Land & Building, Plant & MachineryIIV — Land & Building, Plant & MachineryPVAI — Land & BuildingIIV-RVF — Plant & MachineryChartered Engineer (India) — The Institution of Engineers (India)Licensed Structural Engineer — Maharashtra (UDCPR) — Directorate of Town Planning, Government of MaharashtraMember — The Institution of Engineers (India)

Vidhi M. Chalikwar
Director
Income Tax — Land & BuildingIIV — Land & BuildingIIV-RVF

Umang A. Patel
Director
IBBI — Land & Building, Plant & MachineryIncome Tax — Land & Building, Plant & MachineryIIV — Land & Building, Plant & MachineryIIV-RVF — Land & Building, Plant & MachineryChartered Engineer (India) — The Institution of Engineers (India)Associate Member — The Institution of Engineers (India)

Shashikant B. Chalikwar
Executive Director
Income Tax — Land & BuildingIIV — Land & BuildingIIV-RVF — Land & BuildingChartered Engineer (India) — The Institution of Engineers (India)Member — The Institution of Engineers (India)

Avinash Pandey
Regional Head, Thane
IBBI — Plant & MachineryIncome Tax — Plant & MachineryIIV-RVF — Plant & MachineryChartered Engineer (India) — The Institution of Engineers (India)Member — The Institution of Engineers (India)

Sanjay R. Phadol
Regional Head, Nashik
Related services
You may also need

Techno-Economic Viability Studies
Independent assessment of a project's technical feasibility, cost, means of finance and financial viability for lenders.
Learn more
Lender's Independent Engineer
On behalf of lenders: project cost verification, construction progress monitoring and fund-utilisation certification.
Learn more
Real Estate Valuation
Land, buildings and projects — residential, commercial, industrial and redevelopment — for lenders, courts and tax.
Learn more
Valuation Services in Mumbai
Property, project and plant & machinery valuation across the Mumbai Metropolitan Region, from our head office in Powai.
Learn more