Techno-Economic Viability Studies

Independent Techno-Economic Viability studies that tell a lender whether a proposed project is technically sound, correctly costed and able to service its debt.

Overview

What is a TEV study?

A Techno-Economic Viability (TEV) study is an independent assessment of a proposed project carried out for the lender before a loan is sanctioned. It examines whether the technology, location and implementation plan are sound, whether the project cost and means of finance are reasonable, and whether projected cash flows can service the debt.

Banks commission TEV studies for new projects, expansions and restructuring, usually from consultants on their TEV panel. The report gives the credit team an engineer's and analyst's view that is separate from the promoter's own project report.

Our TEV team combines civil and mechanical engineers, architects, registered valuers and chartered accountants, so the technical, cost and financial sections of a report are each examined by the relevant discipline.

Purposes

What a TEV study answers

  • Technical feasibility

    Is the technology proven, the capacity realistic and the site suitable — with access to utilities, raw materials and approvals?

    Technical feasibility

    • Technology, process and equipment supplier review
    • Installed capacity and assumed utilisation
    • Site access to power, water, raw materials and transport
    • Status of statutory approvals and clearances
  • Project cost

    Are land, civil, plant and machinery and pre-operative costs in line with market rates and the scope of work?

    Project cost

    • Each cost head checked against market rates
    • Quotations, BOQs and contracts reviewed
    • Contingencies and pre-operative expenses assessed
    • Interest during construction and margin money checked
  • Means of finance

    Is the proposed mix of promoter's contribution, debt and other sources adequate and available?

    Means of finance

    • Promoter's contribution and its source
    • Debt-equity ratio against the bank's norms
    • Status of other loans, grants or subsidies
    • Timing of funds against the implementation schedule
  • Market & demand

    Is there demand for the output at the assumed prices — sales absorption for real estate, offtake for industry and power?

    Market & demand

    • Demand and supply for the project's output
    • Selling prices tested against market data
    • Sales absorption rate for real estate projects
    • Offtake or power purchase arrangements
  • Financial viability

    Do projected revenues and costs support the repayment schedule — DSCR, IRR, break-even and payback?

    Financial viability

    • Projections rebuilt from cost and revenue assumptions
    • DSCR, IRR, break-even and payback period
    • Repayment schedule tested against cash flows
    • Working capital and operating cost assumptions reviewed
  • Risks & sensitivity

    How do the numbers change if costs rise, prices fall or implementation is delayed?

    Risks & sensitivity

    • Scenarios for cost overruns and lower prices
    • Effect of delays in implementation
    • Effect of lower capacity utilisation
    • Key risks and mitigants set out for the bank

Scope

Projects we assess

  • Residential, commercial and mixed-use real estate
  • Slum rehabilitation (SRA) and redevelopment projects
  • Affordable housing (PMAY) projects
  • Solar and other renewable-energy plants
  • Manufacturing and process industries
  • Steel, chemicals, packaging and building materials
  • Hotels, hospitals and educational institutions
  • Industrial parks and infrastructure

Checklist

Documents generally required

  • Detailed project report (DPR) and financial projections
  • Land title documents and statutory approvals
  • Cost estimates, BOQs, quotations and contracts
  • Technology / equipment supplier details
  • Audited financials of the promoter company
  • Market or sales data supporting revenue assumptions

Our process

How a TEV study is carried out

  1. Step 01

    Mandate

    The bank appoints us and shares the promoter's project report and sanction proposal.

  2. Step 02

    Information request

    We request approvals, cost estimates, quotations, land documents, contracts and financial statements.

  3. Step 03

    Site visit

    Our engineers inspect the site and any existing operations, and meet the promoter's technical team.

  4. Step 04

    Technical and cost review

    We assess technology, capacity, schedule and each head of project cost against market benchmarks.

  5. Step 05

    Financial analysis

    We rebuild the projections, test the assumptions and run sensitivity scenarios on key variables.

  6. Step 06

    Report

    A TEV report in the bank's format with our findings, observations and conclusion on viability.

Who does the work

Our team for this service

Registered valuers, chartered engineers and specialists who work on TEV assignments.

FAQ

Frequently asked questions

Can't find the answer? Ask us directly — we're happy to explain how an assignment would work.

All questions
What is the difference between a TEV study and a DPR?

A detailed project report is prepared by or for the promoter to describe the project. A TEV study is an independent review of that report commissioned by the lender, testing its assumptions before the loan is sanctioned.

Who appoints the TEV consultant?

Usually the lending bank, from consultants on its panel. The promoter typically bears the fee, but the report is addressed to the bank.

How long does a TEV study take?

It depends on the size of the project and how complete the information is. Most of the time goes into obtaining and verifying documents; we share a clear information list at the start.

Do you also monitor the project after sanction?

Yes — as Lender's Independent Engineer we monitor cost, progress and fund utilisation through construction.

Contact us

Tell us what needs valuing

Take the first step — tell us about the asset or project and we'll take care of the rest.

  • Head office

    B1-001, U/B Floor, Boomerang, Chandivali Farm Road, Powai, Andheri East, Mumbai 400072, Maharashtra, India
  • Other offices

    Thane · Pune · Nashik · Chhatrapati Sambhajinagar · Nanded · Indore · Ahmedabad · Rajkot · Delhi NCR

Get directions Our Google profile & reviews

Send an enquiry

A few details help us send an accurate proposal the first time. Fields marked * are required.

We use these details only to respond to your enquiry, and delete them — with any documents — after 45 days. Privacy policy.